Ozone generator for professional pool-water systems

The generator is assessed as a component of a professional pool-water treatment train. Gas injection, contact, residual-ozone management and monitoring must be defined for the actual circulation system. Treatment performance and the applicable operation requirements are verified for the selected installation.

Equipment in the process

The generator is assessed as a component of a professional pool-water treatment train. Gas injection, contact, residual-ozone management and monitoring must be defined for the actual circulation system. Treatment performance and the applicable operation requirements are verified for the selected installation.

Information for equipment selection

These are selection questions to complete with the site team and the selected equipment documents.

Project parameter Information to provide
Water flow Separate fresh-water throughput, recirculation and peak demand; include the operating schedule.
Water matrix Provide water source, relevant analyses, temperature and variation during operation.
Hydraulic conditions State inlet pressure, outlet backpressure, pump and contact-stage conditions.
Residual-gas duty Describe gas collection, ozone concentration, moisture, temperature and outlet acceptance requirement.
Acceptance evidence Agree test conditions, sampling or measurements and acceptance criteria before ordering.

Supply and site interfaces

The proposal should distinguish this component from the surrounding installation. Agree connection points, supply and return conditions, supporting equipment and who provides installation, commissioning and verification. Use the configuration drawing and interface schedule for the actual order.

Documents for the selected configuration

Confirm the full model designation, equipment list and document revision. The proposal should identify the technical data sheet, interface drawing, instructions and applicable conformity documents for the actual supply.

Operating-cost boundary

List electrical loads, supporting equipment, consumables and maintenance for the selected package. An individual component value should not be presented as the operating cost of the complete installation.

Questions before specification

What should be specified for water flow?

Separate fresh-water throughput, recirculation and peak demand; include the operating schedule.

What data are needed for water matrix?

Provide water source, relevant analyses, temperature and variation during operation.

What is needed before comparing offers?

Use the same process duty and operating conditions for each offer. Compare the selected model, included equipment, interface requirements and acceptance evidence together.

How is the supplied scope confirmed?

Request an equipment list, the responsibilities of supplier and site, and the document revision. Changes to the configuration should be reflected in the technical and commercial proposal.

Discuss your industrial project

Share the process duty, site country and available data. The first enquiry can be brief; a technical questionnaire is agreed after the initial review.

Configuration and price are prepared for the individual project.