Prepare a technical enquiry for an ozone system

A short first enquiry is enough

Tell us your company, the European site location, the process and the problem you want to assess. Add average and peak flow if known, the intended result and your project stage. Mark unknown information as unknown; a complete engineering specification is not needed for the first conversation.

Build the technical data set after the first review

For a water stream, collect representative analyses, flow variation, temperature, pH and relevant target compounds. For a gas process, identify gas composition, moisture, pressure, flow and the receiving process. Add existing treatment stages and a current process diagram.

Agree responsibilities before comparing proposals

Identify who supplies feed gas, power, cooling, dosing, contact vessels, off-gas treatment, instruments and controls. Mechanical connection points, materials, pressure conditions, I/O and communication requirements should be traceable in the quotation.

Give each project role the right evidence

Technical staff need operating limits and interfaces. Quality and environmental staff need sampling, analytical methods and acceptance criteria. Management and finance need the complete capital and operating-cost boundary. Designers and integrators need drawings, control responsibilities and document revisions.

Request the selected configuration documents

Ask for the full model code, equipment list, technical sheet, interface or general-arrangement drawing, instructions and applicable conformity documents. FAT, SAT, commissioning, training and maintenance are agreed activities, not automatically included services.

Information for equipment selection

Project parameterInformation to provide
Water flowSeparate fresh-water throughput, recirculation and peak demand; include the operating schedule.
Water matrixProvide water source, relevant analyses, temperature and variation during operation.
Ozone dutyState the required ozone mass output and concentration in gas at the same operating point.
Feed-gas qualityState gas source, composition, moisture, temperature and the selected generator requirements.
Layout and accessProvide the available footprint, connection positions, service access and installation constraints.
Control interfacesDefine commands, statuses, measurements, alarms and the controller or plant interface to be agreed.
Acceptance evidenceAgree test conditions, sampling or measurements and acceptance criteria before ordering.

Supply and site interfaces

BoundaryTo be agreed between supplier and site
Equipment packageGenerator, feed gas and selected auxiliaries
Water / gas interfacesConnection points, pressures, materials and contact arrangement
UtilitiesPower, cooling, air and site services
AutomationI/O, communication, interlocks and control responsibility
Site work and acceptanceInstallation, FAT / SAT, commissioning and documented criteria

Discuss your industrial project

Share the process duty, site country and available data. The first enquiry can be brief; a technical questionnaire is agreed after the initial review.

Configuration and price are prepared for the individual project.