Ozone system selection, integration and project support
Project support is defined around the requirements of your European site. The initial discussion establishes what needs to be assessed, which equipment is included and where the responsibilities of the customer, supplier and integrator meet.
Process and equipment assessment
Start with a short brief, the site location and available process data. We review the treatment objective, existing process and information needed to assess equipment suitability. A technical questionnaire or test requirement can then be tailored to the project.
Technical integration
The integration scope identifies mechanical connections, electrical supply, feed gas, cooling, dosing, measurement and control interfaces. Existing equipment and new supply should be listed separately, with installation responsibilities and required documentation agreed in the proposal.
Commissioning and verification
Agree the commissioning activities, operating conditions, sampling methods, acceptance criteria and training requirements before implementation. The proposal defines who performs and documents each activity. A commissioning scope does not itself confirm that a treatment result has already been demonstrated.
Maintenance and ongoing support
Maintenance, spare parts, remote assistance and on-site work are defined for the selected equipment, location and agreement. Warranty terms, response arrangements, travel and chargeable work follow the agreed project documentation. Ask for the specific support scope rather than assuming a universal response-time commitment.
Support defined in the project agreement
- Agreed equipment and warranty scope
Warranty, installation, commissioning and maintenance responsibilities follow the agreed equipment and contract scope.
- Maintenance requirements
Technical assistance and on-site maintenance are arranged for the equipment and site location, with inclusions and chargeable work stated in the agreement.
- Repair and Modernization Services:
- Cost of spare parts and maintenance work (varies based on equipment size)
- Contract-based service package (materials and labor included)
- Custom solutions as per contract agreement.
For designers and integrators
Equipment documentation
Agree the documents and maintenance records required for the selected equipment and project.
Support arrangements
Support channels, availability and response arrangements are defined in the project agreement.
Technical consultation
Review operating conditions, equipment documents and the interfaces relevant to the site.
Spare parts
Confirm the exact model, part reference, availability and commercial terms before ordering.
Inspection and maintenance
Agree inspection, cleaning and maintenance activities for the equipment and operating conditions.
Project-specific scope
Define the required assistance, responsibilities and chargeable work in the proposal.
Share the process diagram, equipment boundary, layout and utility conditions, together with the mechanical and control-interface requirements. The technical package can then identify the model documents, connection data and responsibilities needed for a comparable proposal. Contact us early if the project is still at concept stage.
Information for designers and integrators
Start with the design stage, P&ID, battery limits, utility conditions and document format. Agree the I/O list, communication protocol, control hierarchy and interlocks for the selected controller. Identify FAT, SAT and document-handover responsibilities before comparison.
| Boundary | To be agreed between supplier and site |
|---|---|
| Equipment package | Generator, feed gas and selected auxiliaries |
| Water / gas interfaces | Connection points, pressures, materials and contact arrangement |
| Utilities | Power, cooling, air and site services |
| Automation | I/O, communication, interlocks and control responsibility |
| Site work and acceptance | Installation, FAT / SAT, commissioning and documented criteria |
Agree an acceptance record
Record the inlet conditions, treated flow, operating duty, target parameter, sampling locations, analytical method and acceptance value. Separate factory equipment checks from site integration and process-performance tests. Training, maintenance and response arrangements follow the individual agreement.
Operating-cost boundary
Separate the generator electricity figure from oxygen supply, compression, cooling, dosing and off-gas treatment. Compare the whole agreed installation at the same duty point and operating hours.