Equipment in the process
A containerised ozone installation combines the equipment and site interfaces agreed for a particular process. The container format alone does not define ozone output or a complete scope of supply. Generator, feed gas, cooling, dosing, residual-gas treatment, measurements and controls are specified in the project equipment and responsibility schedule.
Information for equipment selection
These are selection questions to complete with the site team and the selected equipment documents.
| Project parameter | Information to provide |
|---|---|
| Equipment boundary | List existing equipment, supplier equipment, site work and the party responsible for each interface. |
| Ozone duty | State the required ozone mass output and concentration in gas at the same operating point. |
| Feed-gas quality | State gas source, composition, moisture, temperature and the selected generator requirements. |
| Cooling interface | Provide heat duty if known, water flow, inlet temperature, pressure, quality and summer constraints. |
| Electrical supply | State voltage, phases, frequency, available capacity and the package load boundary. |
| Container and site logistics | Provide site access, lifting, foundation and transport limits; use the approved configuration GA. |
| Control interfaces | Define commands, statuses, measurements, alarms and the controller or plant interface to be agreed. |
Supply and site interfaces
The proposal should distinguish this component from the surrounding installation. Agree connection points, supply and return conditions, supporting equipment and who provides installation, commissioning and verification. Use the configuration drawing and interface schedule for the actual order.
| Boundary | To be agreed between supplier and site |
|---|---|
| Equipment package | Generator, feed gas and selected auxiliaries |
| Water / gas interfaces | Connection points, pressures, materials and contact arrangement |
| Utilities | Power, cooling, air and site services |
| Automation | I/O, communication, interlocks and control responsibility |
| Site work and acceptance | Installation, FAT / SAT, commissioning and documented criteria |
Documents for the selected configuration
Confirm the full model designation, equipment list and document revision. The proposal should identify the technical data sheet, interface drawing, instructions and applicable conformity documents for the actual supply.
Operating-cost boundary
Compare equipment, integration, transport, site preparation, utilities and maintenance within the same supply boundary. A container format does not establish an energy-saving or installation-cost figure.
Questions before specification
Is a container a standard complete installation?
The container defines a packaging format. The equipment list, external utilities, site works and operating envelope still need an agreed project specification.
Can an earlier container project establish this project’s capacity?
No. A historical output or arrangement applies only to that documented configuration. Confirm the selected generator and the current package drawing.
What site information is needed before layout approval?
Provide access, transport and lifting limits, foundation conditions, connection points, ambient range, heat rejection and maintenance space.
What is needed before comparing offers?
Use the same process duty and operating conditions for each offer. Compare the selected model, included equipment, interface requirements and acceptance evidence together.
How is the supplied scope confirmed?
Request an equipment list, the responsibilities of supplier and site, and the document revision. Changes to the configuration should be reflected in the technical and commercial proposal.
Discuss your industrial project
Share the process duty, site country and available data. The first enquiry can be brief; a technical questionnaire is agreed after the initial review.
Configuration and price are prepared for the individual project.