Adsorption dryer for feed-gas preparation

The dryer prepares a defined feed-gas stream for the selected ozone installation. Selection depends on gas flow, pressure, temperature and the required moisture level at the generator inlet. The drying duty and the scope of filters, regeneration and supporting equipment must be confirmed for the actual package.

Category

Equipment in the process

The dryer prepares a defined feed-gas stream for the selected ozone installation. Selection depends on gas flow, pressure, temperature and the required moisture level at the generator inlet. The drying duty and the scope of filters, regeneration and supporting equipment must be confirmed for the actual package.

Information for equipment selection

These are selection questions to complete with the site team and the selected equipment documents.

Project parameter Information to provide
Gas flow Give minimum, nominal and peak flow, the unit and normal-reference conditions.
Gas pressure Identify the measurement point, working range and whether pressure is absolute or gauge.
Moisture specification Specify the dew-point requirement together with its pressure basis and measurement location.
Feed-gas quality State gas source, composition, moisture, temperature and the selected generator requirements.
Maintenance access Define inspection points, cleaning or replacement work and access during maintenance.

Supply and site interfaces

The proposal should distinguish this component from the surrounding installation. Agree connection points, supply and return conditions, supporting equipment and who provides installation, commissioning and verification. Use the configuration drawing and interface schedule for the actual order.

Documents for the selected configuration

Confirm the full model designation, equipment list and document revision. The proposal should identify the technical data sheet, interface drawing, instructions and applicable conformity documents for the actual supply.

Operating-cost boundary

List electrical loads, supporting equipment, consumables and maintenance for the selected package. An individual component value should not be presented as the operating cost of the complete installation.

Questions before specification

What should be specified for gas flow?

Give minimum, nominal and peak flow, the unit and normal-reference conditions.

What data are needed for gas pressure?

Identify the measurement point, working range and whether pressure is absolute or gauge.

What is needed before comparing offers?

Use the same process duty and operating conditions for each offer. Compare the selected model, included equipment, interface requirements and acceptance evidence together.

How is the supplied scope confirmed?

Request an equipment list, the responsibilities of supplier and site, and the document revision. Changes to the configuration should be reflected in the technical and commercial proposal.

Discuss your industrial project

Share the process duty, site country and available data. The first enquiry can be brief; a technical questionnaire is agreed after the initial review.

Configuration and price are prepared for the individual project.