Equipment in the process
An ozonated water system combines ozone generation with gas transfer into a defined water flow. The required water quality, operating flow, dissolved-ozone measurement point and treatment objective determine the configuration. Gas-generator output and ozone concentration in the gas are different from the dissolved concentration measured at the water outlet.
Information for equipment selection
These are selection questions to complete with the site team and the selected equipment documents.
| Project parameter | Information to provide |
|---|---|
| Water flow | Separate fresh-water throughput, recirculation and peak demand; include the operating schedule. |
| Water matrix | Provide water source, relevant analyses, temperature and variation during operation. |
| Dissolved-ozone task | Define the intended water measurement point, target and analytical method. |
| Hydraulic conditions | State inlet pressure, outlet backpressure, pump and contact-stage conditions. |
| Contact materials | Identify the process medium, materials, seals and the required compatibility documents. |
| Residual-gas duty | Describe gas collection, ozone concentration, moisture, temperature and outlet acceptance requirement. |
| Control interfaces | Define commands, statuses, measurements, alarms and the controller or plant interface to be agreed. |
Supply and site interfaces
The proposal should distinguish this component from the surrounding installation. Agree connection points, supply and return conditions, supporting equipment and who provides installation, commissioning and verification. Use the configuration drawing and interface schedule for the actual order.
| Boundary | To be agreed between supplier and site |
|---|---|
| Equipment package | Generator, feed gas and selected auxiliaries |
| Water / gas interfaces | Connection points, pressures, materials and contact arrangement |
| Utilities | Power, cooling, air and site services |
| Automation | I/O, communication, interlocks and control responsibility |
| Site work and acceptance | Installation, FAT / SAT, commissioning and documented criteria |
Documents for the selected configuration
Confirm the full model designation, equipment list and document revision. The proposal should identify the technical data sheet, interface drawing, instructions and applicable conformity documents for the actual supply.
Operating-cost boundary
Include ozone generation, gas preparation, pumps, cooling, measurement and the actual use cycle. Recirculation flow and fresh-water use are separate inputs to a cost comparison.
Questions before specification
Does a high water concentration define the treatment result?
No. Confirm the concentration at a named water measurement point together with water quality, flow, contact conditions and the actual target.
Can the archived GWS1 profile define every water-system configuration?
No. The selected model, pump arrangement, water duty and current document revision must be linked before model-specific values are accepted.
Is recirculation flow the same as fresh-water consumption?
No. State the circulation loop, treated process flow and makeup or discharge separately. They have different roles in sizing and cost calculations.
What is needed before comparing offers?
Use the same process duty and operating conditions for each offer. Compare the selected model, included equipment, interface requirements and acceptance evidence together.
How is the supplied scope confirmed?
Request an equipment list, the responsibilities of supplier and site, and the document revision. Changes to the configuration should be reflected in the technical and commercial proposal.
Discuss your industrial project
Share the process duty, site country and available data. The first enquiry can be brief; a technical questionnaire is agreed after the initial review.
Configuration and price are prepared for the individual project.

