Equipment in the process
A closed cooling loop connects the equipment heat load with an agreed heat-rejection arrangement. Pumps, heat exchanger, tank and controls are selected around the generator duty and site conditions. The equipment cooling flow is separate from the flow of water being treated with ozone.
Information for equipment selection
These are selection questions to complete with the site team and the selected equipment documents.
| Project parameter | Information to provide |
|---|---|
| Cooling interface | Provide heat duty if known, water flow, inlet temperature, pressure, quality and summer constraints. |
| Heat rejection | Identify the external heat sink and confirm operation at the limiting ambient or water temperature. |
| Electrical supply | State voltage, phases, frequency, available capacity and the package load boundary. |
| Contact materials | Identify the process medium, materials, seals and the required compatibility documents. |
| Maintenance access | Define inspection points, cleaning or replacement work and access during maintenance. |
Supply and site interfaces
The proposal should distinguish this component from the surrounding installation. Agree connection points, supply and return conditions, supporting equipment and who provides installation, commissioning and verification. Use the configuration drawing and interface schedule for the actual order.
Documents for the selected configuration
Confirm the full model designation, equipment list and document revision. The proposal should identify the technical data sheet, interface drawing, instructions and applicable conformity documents for the actual supply.
Operating-cost boundary
List electrical loads, supporting equipment, consumables and maintenance for the selected package. An individual component value should not be presented as the operating cost of the complete installation.
Questions before specification
What should be specified for cooling interface?
Provide heat duty if known, water flow, inlet temperature, pressure, quality and summer constraints.
What data are needed for heat rejection?
Identify the external heat sink and confirm operation at the limiting ambient or water temperature.
What is needed before comparing offers?
Use the same process duty and operating conditions for each offer. Compare the selected model, included equipment, interface requirements and acceptance evidence together.
How is the supplied scope confirmed?
Request an equipment list, the responsibilities of supplier and site, and the document revision. Changes to the configuration should be reflected in the technical and commercial proposal.
Discuss your industrial project
Share the process duty, site country and available data. The first enquiry can be brief; a technical questionnaire is agreed after the initial review.
Configuration and price are prepared for the individual project.
